Transformer Rig & Transport

A Local Utility Company had a need to rig and transport one transformer from a substation to another substation within the city limits of Pittsburgh, PA. The challenging haul included jacking and sliding the transformer seven times from truck to rail to truck and then maneuvering the load under a RR bridge by sliding the load on rails and then back to truck.

TUI was responsible for the entire process associated with the difficult haul and every detail was directed by TUI including: town meetings, security and emergency medical personnel, certified wire lifters, route surveys, parking spaces and road improvements.

See more Special Projects
Project Details


Loaded Height:

Transformer Weight:

Gross Weight:

18'H

300,000 LBS.

555,000 LBS.
 